Concept. Since waterspots are chaning and wells are chaning. I now have a bunch of wells that are over powering the waterspots. I would love to turn some of my wells off until I can redsign the setup. The only option I have though is to grind them down until they stop working. If I could shut off wells until I get my balance, that would be great. Then if this waterspot ever changed and started producing the water it use to produce, then I could simply turn the wells back on. As it currently works, I have to destroy the wells and if the waterspot starts producing again, rebuild the well.
0.0339804