Hey there, I'm not sure if it's a bug but it seems that the ammount of the cables and tubes doesnt really represent the Meter-count. I wanted to connect my Base to a water spot nearly 1500m away but my three 999x stacks of tubes werent enough to bridge the distance, not even close! Furthermore after connecting (after stacking up again on tubes) they bugged and i couldnt see the first part of the pipeline (not sure if it worked either way)
0.0167076